![]() ![]() ![]() Use these adjusted settings to create the rest of the roof system on the lower level, then repeat the process for the upper roofs.Coordinate the height and thickness of the roof in each elevation.Draw the first roof piece on plan by tracing over the roof outline from the original drawing.Repeat for the doors, first on plan, then in elevation.Adjust window heights, types and glazing patterns to match the original drawings.Open each of the Elevation viewpoints and correspond the DWG Worksheets for trace reference.Place windows in the walls using the plan DWGs as references for location and width.Set up the wall tool for the proper thickness and height, then trace the outline of the building.Move the original MasterTemplate base slabs, elevation and section markers, and gridlines to the vicinity of the traced DWG.Use Virtual Trace to reference the ground floor DWG as a background while working on the ground floor plan.Set up the Story Levels to correspond to the project heights.Import the DWG files into separate Worksheets and coordinate their origin points. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |